Tuesday, June 1, 2010

Carpet measure-up & PCI fix ups


Couldn't resist snapping a few pics today while meeting the carpet man out at the house to do our on-site measure. Splashback looking nice and shiny.


Chipped floor tiles in the bathroom have been ripped up and new ones laid. Looks much nicer. The tiler has also fixed up a couple of holes in the grout etc that we put stickers on at PCI.


Two tiling items still to fix. Here's one below. It's the tile right in the corner of the ensuite next to the vanity. The wall looks out of square because the tile hasn't been cut right and the grout lines being a mm out here and there have resulted in the tiler getting to the end and having this crooked one. He will rip up that whole row probably and ensure they are more evenly/parallel spaced. The other tiling issue is one of the shower tiles in the main bathroom sticks out 5mm from the rest. The shower screen needs to be taken off for this tile to be redone.

Our scratched internal door handles have been replaced. The ensuite mirror will be replaced as there's a huge scratch on it that we missed at PCI- thanks must go to the Henley cleaning lady who pointed it out to our ss! Also spoke to the glass guys who came to measure up 4 of our front windows for new glass, which were scratched when the mortar was cleaned off them. Our ss is out at the house now with a carpenter and they are replacing the front door lock (dented) and turning the middle panel of our stacker door around the right way. He will ring us later in the week to let us know if he's on target for handover :-)

2 comments:

  1. So will all this be finished before handover, and will you have to wait long? Hoping all move along smoothly for you. The anticipation must be killing you!

    ReplyDelete
  2. It better all be done! We don't want to accept it until everything is done because we've heard how hard it is to get the builder to come back, particularly for big things.

    ReplyDelete