Framing continues!


The facade- not quite finished yet- more walls to go up.


Looking through the Kid's Retreat double door frame and through to the kitchen and entrance hallway.

Cleaning up a bit with the blower.

Their first mistake :-( The study door frame (inset) is double and the Master Bedroom (further in background) should be double too but they have built a 1 and 1/2. We changed this before signing the final contracts but the builders have obviously been given the wrong set of plans. Easy enough to fix as long as they get onto it asap before the roof goes on. Have emailed to let them know.