Half the external frame went up today! So exciting! The rest of it has been marked out on the ground- was so fun walking through each room. But the markings on the floor make it look pretty small. Stood in the WIR and was like- is there enough space in here?????????

Two ensuite windows.

The three minor bedroom windows can be seen in this shot. They will wrap around the outside of the Kids' Retreat.


3 Master Bedroom windows

Sides of the kitchen, WIP and study are ready to go up!

5 comments:

  1. I drove passed today, was excited to see your frame... amongst other things that also excited me...

    I was driving so slow every tradie was watching me, it was so embarrassing! I planted the foot and sped off

    ReplyDelete
  2. Tradie embarassment! It's hard to be confident when there are five guys with their tops off looking at you, isn't it? I panic, wipe the drool and speed off too! Haha.

    ReplyDelete
  3. That's why we like summer girls!!!

    Don't worry about things looking small (in the house) when you have the walls plastered you feel the size then.

    ReplyDelete
  4. haha!! You girls make me laugh!! Frame is looking divine!!! How cool is that you can see each room!!

    ReplyDelete
  5. When we did the walkthrough, it also seemed small. Plays tricks on the mind !!! Don't worry, though, looks great when the plaster is on.