Monday, November 30, 2009
More blind shopping- on a budget!
Just when we thought we had the best deal ever on blinds, I decided on a whim to get another quote from Home Outlet in Thomastown. Their timber venetians are about $30 per blind cheaper than Spotlight... Just not sure I like them quite as much! The colour is slightly too 'red' and the blinds are 100% timber, not a timber/resin mix (which would be more suitable for us as one of the blinds will be in the portico- exposed to some weather) Will take their quote to Spotlight tomorrow. Apparently Spotlight price match, so if they can beat HO that would be sensational. But HO has the ones with the wider slat (63.5mm) compared to Spotlight's 50mm....*oooooo!* I don't know...
Saturday, November 28, 2009
Plumbing and electrical
What a surprise! All the plumbing and electrical cables were roughed in late this week some time. This is the laundry, where the trough will go.
And they've put in the bath hob! Can't wait to soak in there :-)
Our shower- you can see where the taps will be attached on the left and the shower head on the upper right.
Also got our quote from Spotlight for the blinds. All up, just a fraction over 3k for all window coverings except minor bedrooms and two family room windows (not sure what we want there yet). An excellent deal. Would have been over 4k if not for the 25% off sale. Will go and pay the deposit tomorrow.
Monday, November 23, 2009
Site meeting
Fronted up to the house this morning at 7:30 and ambled around with steaming hot maccas coffees until our s/s arrived to meet with us at 8am. He was very responsive to all of our questions/concerns and assured us that most of them are easily fixed, as we thought.
* The bolts on the front portico support pole will be relocated so they are in the concrete,
* The master bedroom doorway will be widened as per contract drawings (his plans were also incorrect),
* The alfresco studs are within the load limit as there is a double stud in the centre of the corner,
* One of our front windows will have part of the surrounding sill replaced (splintered timber),
* Crack in the slab is apparently nothing to worry about. Anything less than 2mm is supposed to be ok. Not 100% convinced on this still...
* Bulkhead in kitchen will be secured later.
* Walls will all be straightened and triple checked before plaster goes on (yay!)
Also found out there won't be much action on our place over xmas and all of January as our s/s will be on holidays. Bricking and plaster will not start until Feb. It'll be a long wait with not much action, but makes a holiday completion time (end of March) more likely which is a good thing :-)
* The bolts on the front portico support pole will be relocated so they are in the concrete,
* The master bedroom doorway will be widened as per contract drawings (his plans were also incorrect),
* The alfresco studs are within the load limit as there is a double stud in the centre of the corner,
* One of our front windows will have part of the surrounding sill replaced (splintered timber),
* Crack in the slab is apparently nothing to worry about. Anything less than 2mm is supposed to be ok. Not 100% convinced on this still...
* Bulkhead in kitchen will be secured later.
* Walls will all be straightened and triple checked before plaster goes on (yay!)
Also found out there won't be much action on our place over xmas and all of January as our s/s will be on holidays. Bricking and plaster will not start until Feb. It'll be a long wait with not much action, but makes a holiday completion time (end of March) more likely which is a good thing :-)
Friday, November 20, 2009
Ready for insulation
Well not much has happened in the last two days. But we do have this sheet stapled to the frame, which from what I can gather, means that the insulation people have inspected the site to make sure it is safe before they come in and put the fluffy stuff in.
And here's how it looks from the street. They've taken lots of rubbish away from the front so could have actually driven into the garage for the first time. Might try that tomorrow! Really looking forward to those bricks now :-)
Wednesday, November 18, 2009
We're wrapped!
Site meeting Monday
Organised for a site meeting first thing Monday morning. What a great birthday present for Christopher! Will be writing a list of concerns so we don't forget anything and discussing these things with our SS. Looking forward to visiting the house this afternoon to see if anything has been done (electrical, plumbing etc) Haven't been out there since Sunday, which is the biggest non visit stretch we've had since starting. Feels like it's been weeks since we've set eyes on our frame!
Monday, November 16, 2009
Probs with the frame
Trying to organise a site meeting as soon as possible. Several issues with our frame still and we are not happy to pay the frame invoice while we still have a defective product.
* The studs supporting the corner of the alfresco are single- they should be double. Single will not support the load.
* The kitchen bulkhead frame has only been secured at each end, not nailed up in the middle- it sags into a u shape.
* No wall straightening has been done-plaster will be all wavy if it goes up.
* Doorway to master still not adjusted.
Hopefully we can discuss the problems asap and have them fixed. Will not be a happy possum if they continue with the plaster before fixing the frame!
* The studs supporting the corner of the alfresco are single- they should be double. Single will not support the load.
* The kitchen bulkhead frame has only been secured at each end, not nailed up in the middle- it sags into a u shape.
* No wall straightening has been done-plaster will be all wavy if it goes up.
* Doorway to master still not adjusted.
Hopefully we can discuss the problems asap and have them fixed. Will not be a happy possum if they continue with the plaster before fixing the frame!
Saturday, November 14, 2009
Hot water & blinds
Two of these beauties (but longer) will be going in our ensuite. They're the PVC ones, not wood, so perfect for a steamy area.
Pretty sure this is the colour we will go for across the front of the house (ignore the yukky pelmet at the top- the real colour will be same as the slats) Still considering the plantation shutters for the front, but they don't come in exactly the colour we want (not too light, not too dark), they are $110 more expensive (each) than the venetians- so for 9 windows that's a lot of extra $$$! The other thing that really put us off was that they say installation is 'compulsory' when ordering the plantation shutters- and it's about $70 per panel. Too expensive overall, for a look that is not too different to the venetians anyway.
Scored a measure and quote appointment with the Spotlight lady next weekend, which was lucky as normally there's a few weeks wait. She will show us the full range of colours and we can decide then. Looked at the ready to hang ones- which are a really good price- but all our windows are non standard sizes so they would all need to be cut. On top of that, when I tried to find the nearest sizes, they were all out of every one. Even though we're getting the 'custom' option, we still got 25% off the final price anyway because of the sale they have for ordering 13 or more custom blinds. This brought the entire quote down to a very reasonable figure and they'll be made to measure! Be great to have them ready to install the day we move in!
Wednesday, November 11, 2009
A bit of a setback
Alas, our run of rapid progress looks like it has come to a grinding halt- our brickies were supposed to start this week, but, there are no more of our bricks! Our SS called and asked if we wanted to change our mind about the bricks we chose and get something else instead, but we've decided to stick with our initial decision and be patient. It's only supposed to be about a three week wait and next door's house is being built with our second choice brick- Mocha- so that discourages us a little further from changing. Apparently they're going to build our place in reverse (sort of)- just like Krystal's :-) They'll do the electrical, wrap it and plaster it before the bricks arrive. Sounds interesting!
Tuesday, November 10, 2009
Monday, November 9, 2009
Roof tiles- tick
Roof tiles are done apparently. Just got to put the flashing on. No sign of any bricks yet, but they can't be too far away! Here brickie, brickie, brickie.......
Our house is getting a lid!
Friday, November 6, 2009
Thursday, November 5, 2009
Guttering and fascia is on!
Yay!!! It's looking like a house more and more!
Not happy about the scratches on a few sections of the guttering.... Click on the photo to enlarge it and you'll be able to see what I mean. Before anybody accuses me of being fussy, ask yourself- would you buy a Ferrari for a quarter of a million dollars and say, 'yep, I'll take it with that scratch on the door, that's fine.' As if! It's just careless workmanship. Particularly unhappy as I spoke to the guttering man on Sunday and he was raving on about how high the standards are with henley and specifically mentioned that they don't tolerate any scratches Colorbond. So why put this crap on our house then ay? Pretty sure Henley will have no probs having the guys do it again.
Wednesday, November 4, 2009
Garage and portico roofs
Zoomed out to the house this afternoon and saw more progress. They have done the garage frame and put the roof trusses on it. They were working on the portico roof trusses when we got there. There's still a wall and window not done yet on the left hand corner of the portico, so it doesn't quite look right yet. Really loving how the facade is coming along though. Think the Mink was a good choice!
Tuesday, November 3, 2009
Roof trusses, windows and doors!
We have a roof!!!!!!!! And all the windows and sliding doors are in. Amazing how much they can get done in one day!!! Apparently they are behind schedule though- how could they go any faster??? Spoke to the contractor who is going to do the fascia and guttering out at the block this morning. He said they were due to start tomorrow but obviously we aren't ready for them yet. He said he'll be back next week. Had lots of positive things to say about Henley, which is good coming from someone in the industry.
Standing in our ensuite :-)
Sunday, November 1, 2009
Excavation finished- phew!
Subscribe to:
Posts (Atom)